Systems integration
One coordinated production line
Malaysian system integrators design, build and commission cells and lines around imported industrial robot arms and local or imported automation equipment. Define the complete outcome and responsibility for every interface.
- 01
Engineering and layout
Translate the process into a working layout, cycle-time model and equipment specification. Confirm utilities, foundations and upstream and downstream connections.
- 02
Tooling, controls and safety
Fixtures, end effectors, conveyors, PLCs and safeguarding belong in the same scope. Clarify the destination's compliance requirements before equipment is built.
- 03
Factory acceptance testing
Agree measurable acceptance criteria before placing an order. Use representative parts, production conditions and documented results wherever practical.
- 04
Installation and site acceptance
Plan freight, access, rigging, utilities and commissioning. Identify the local team and the conditions for final acceptance at your facility.
- 05
Training and ongoing support
Include operator and maintenance training, documentation, spare parts and a support escalation path. Establish ownership of software and access rights.
Make proposals comparable
- Use the same specification for each supplier
- Separate equipment, freight and installation costs
- Document exclusions and buyer responsibilities
- Agree milestones and acceptance evidence
Define your complete line